| Date | Status | Code | Description | Ref | Location | Comments |
| 8/8/2024 | Transfer | 01 | See inspection comments | | | Room 100 requires can lights to be cut into soffit. |
| 8/8/2024 | Transfer | 01 | See inspection comments | | | Emergency light junction box on 2nd floor incomplete. |
| 8/8/2024 | Transfer | 01 | See inspection comments | | | Add dead fronts where panels are live and do not have a cover installed. |
| 8/8/2024 | Transfer | 01 | See inspection comments | | | 2nd floor conduits containing new conductors require a ground wire. |
| 8/8/2024 | Transfer | 01 | See inspection comments | | | 2nd floor conduits between gutters and panels require #10 conductors to be used where #12s are. |
| 8/2/2024 | Corrected | 01 | See inspection comments | | rooms 101-111 | Industrial raised cover on all exposed quads
Rm 1111
Recep no power
Missing plate
Broken plate
Rm 1110
Missing can trim
Missing plate
Rm 109
Hot-ground reverse
Rm 108
Can trim
Rm 106
Headboard needs to move to the left
Rm 104
Blank cover bathroom
Rm 102
Light switch dead short
Rm 101
Light switch dead short
Rm 100
Can lights need to be cut in
|
| 8/1/2024 | Corrected | 01 | See inspection comments | | | 341 receptacle to right of headboard needs full access and bath can light trim missing. |
| 8/1/2024 | Corrected | 01 | See inspection comments | | | Need access to room 335. |