Inspection #: 816519
Inspection Type: Final Electrical
Inspector: M.Green
Result: Correction
Comment: Partial electrical final inspection of electrified truck parking spaces service only. Service approved. Tag #41462. NOTES: 1) Question raised previously regarding correct system voltage to serve truck refrigeration units has been resolved by instructions to proceed with 208V service as per plans. 2) Electrified truck parking spaces service previous corrections resolved except available fault current labelling. 3) Other corrections from previous inspections are outstanding. 4) One new correction.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
9/25/2024TransferCorrect Below* MDP style service disconnect portion.CEA has installed a lock on the door to the service disconnects. Remove lock to provide access to service disconnects as required by 2017 NEC 240.24(B)(1).
8/1/2024CorrectedCorrect Below*  Does voltage of service match requirements for TRUs?
8/1/2024TransferCorrect Below*  Label service with available fault current and date calculated.
8/1/2024CorrectedCorrect Below*  NEC 626.31(C) requires specific voltage/amperage ratings for receptacles. Installation does not match these requirements. Cords on TRUs do not match up with voltage, amperage, or pin configuration of installed receptacles.
8/1/2024CorrectedCorrect Below*  Physical protection required at Electrified truck service and receptacle pedestals.
3/4/2024TransferCorrect Below*  Heat trace requires labels and lockout on breaker.
3/4/2024TransferCorrect Below*  Label disconnects with source.
3/4/2024TransferCorrect Below*  30" width and 36" depth workspace required at exterior compactor controller.
3/4/2024TransferCorrect Below*  Compactor and baler require wire phasing.
2/1/2024TransferCorrect Below*  Platform required at rooftop condensing units so that centerline of disconnect handle is no greater than 6'7" above working platform.
2/1/2024CorrectedCorrect Below*  Shore power service and associated hook ups incomplete.
2/1/2024TransferCorrect Below*  Truck plugs at loading dock incomplete.
2/1/2024TransferCorrect Below*  Compactor disconnect requires bonding bushing.
2/1/2024TransferCorrect Below*  Conveyor system incomplete. Not all components appear to have a valid listing label. Field evaluation by a NRTL may be required.