Date | Status | Code | Description | Ref | Location | Comments |
7/25/2024 | Transfer | PlumbRgh12 | Piping Support | Piping is not properly supported- UPC Section 313.0, including Table 313.1 | All vertical fl-fl plumbing piping | Support at every fl & mid story guides required. |
7/18/2024 | Transfer | PlumbRgh14 | Comments | See Inspectors Comments | | Cleanouts required for WC and most sinks. All drain lines on 1st floor beyond 5 feet from main require a cleanout.
THIS IS FOR ENTIRE FIRST FLOOR |
7/18/2024 | Corrected | PlumbRgh14 | Comments | See Inspectors Comments | | Hangers required for WC arms, riser clamps required for floor to floor piping, call back in inspection for 160,162,163,164,165,166. |
7/18/2024 | Transfer | PlumbRgh14 | Comments | See Inspectors Comments | | Listed transition bands required through out entire rough. Replace and re-test, call back in inspection for 160,162,163,164,165,166. |