| Date | Status | Code | Description | Ref | Location | Comments |
| 8/12/2024 | Transfer | Correct Below | * | | Bridge | Install bonding jumper provided. |
| 8/12/2024 | Transfer | Correct Below | * | | 1" LFMC between controller and lighting on bridge. | Install LFMC per NEC, fasten and support. Max of equivalent of 4 90 degree bends allowed per run of conduit. |
| 8/12/2024 | Transfer | Correct Below | * | | New gateway bridge. | Provide documentation and verify listing label on control panel covers the complete bridge. Listing label on equipment appears to be for a industrial control equipment using UL standard 508A. Does not appear to cover entire piece of equipment. |