Inspection #: 799648
Inspection Type: Electrical Rough
Inspector: O.Burbridge
Result: Correction
Comment: Some corrections made. Electrical final approved conditionally until August 1, 2024 for Phase 1 only pending completion of noted items and approval of phase plan by plan review.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
4/10/2024Transfer01See inspection comments  Door controllers in stairwells incomplete.
4/10/2024Transfer01See inspection comments  Boiler room incomplete.
4/10/2024Corrected01See inspection comments  Safe off exposed wiring in stairwells and in rooms 319 and neighboring rooms.
4/10/2024Corrected01See inspection comments  Exit sign required at 2nd floor exit.
4/10/2024Corrected01See inspection comments  Work space required at 2nd floor inverter.
4/10/2024Transfer01See inspection comments  If building is intended to be partially occupied before project completion a deferred submittal must be provided which details the Phase Plan. The Phase Plan must identify the portions of the building intended to be occupied, life safety systems, egress paths, access to electrical systems, and construction area separation methodology.