Date | Status | Code | Description | Ref | Location | Comments |
4/9/2024 | Transfer | Correct Below | * | | | Properly sized pull boxes or condulets required between transfer switch and generator. |
4/9/2024 | Transfer | Correct Electrical Below | * | | | At generator feeders add external bond jumpers around liquidtight flex to bond rigid elbows. |
4/4/2024 | Transfer | Correct Below | * | | | Provide panel schedules, labeling of AFC and date calculated at service, breaker lock for heat trace, and conduit supports. |