Click Here To View Another Inspection Inspection #: 795877 Inspection Type: FireStopping Inspector: P.Calhoun Result: Correction Comment: Structural for fire stop for 2nd floor corridor for ceiling covering. Fire stop for bathroom tub connect for rooms 228-241. Ceiling panel earthquake strapping for 2nd and 3rd floor ceilings in corridor Requested by: Mark begich 1 (907) 229-1465 scopepne.kayli@gmail.com Requested by: Mark Begich 907-229-1465 scopepne.kayli@gmail.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments 3/13/2024TransferF1see inspector comments Complete fire stopping at p-trap locations and in corridor above ceilings.