Date | Status | Code | Description | Ref | Location | Comments |
8/1/2024 | Transfer | Correct Below | * | | | Does voltage of service match requirements for TRUs? |
8/1/2024 | Transfer | Correct Below | * | | | Label service with available fault current and date calculated. |
8/1/2024 | Transfer | Correct Below | * | | | NEC 626.31(C) requires specific voltage/amperage ratings for receptacles. Installation does not match these requirements. Cords on TRUs do not match up with voltage, amperage, or pin configuration of installed receptacles. |
8/1/2024 | Transfer | Correct Below | * | | | Physical protection required at Electrified truck service and receptacle pedestals. |
3/4/2024 | Transfer | Correct Below | * | | | Heat trace requires labels and lockout on breaker. |
3/4/2024 | Transfer | Correct Below | * | | | Label disconnects with source. |
3/4/2024 | Transfer | Correct Below | * | | | 30" width and 36" depth workspace required at exterior compactor controller. |
3/4/2024 | Transfer | Correct Below | * | | | Compactor and baler require wire phasing. |
2/1/2024 | Transfer | Correct Below | * | | | Platform required at rooftop condensing units so that centerline of disconnect handle is no greater than 6'7" above working platform. |
2/1/2024 | Transfer | Correct Below | * | | | Shore power service and associated hook ups incomplete. |
2/1/2024 | Transfer | Correct Below | * | | | Truck plugs at loading dock incomplete. |
2/1/2024 | Transfer | Correct Below | * | | | Compactor disconnect requires bonding bushing. |
2/1/2024 | Transfer | Correct Below | * | | | Conveyor system incomplete. Not all components appear to have a valid listing label. Field evaluation by a NRTL may be required. |