3/4/2024 | Transfer | Correct Below | * | | | Heat trace requires labels and lockout on breaker. |
3/4/2024 | Transfer | Correct Below | * | | | Label disconnects with source. |
3/4/2024 | Transfer | Correct Below | * | | | 30" width and 36" depth workspace required at exterior compactor controller. |
3/4/2024 | Transfer | Correct Below | * | | | Compactor and baler require wire phasing. |
2/1/2024 | Transfer | Correct Below | * | | | Platform required at rooftop condensing units so that centerline of disconnect handle is no greater than 6'7" above working platform. |
2/1/2024 | Corrected | Correct Below | * | | | Compressor A and C require max 200A overcurrent protection. |
2/1/2024 | Transfer | Correct Below | * | | | Shore power service and associated hook ups incomplete. |
2/1/2024 | Transfer | Correct Below | * | | | Truck plugs at loading dock incomplete. |
2/1/2024 | Transfer | Correct Below | * | | | Compactor disconnect requires bonding bushing. |
2/1/2024 | Transfer | Correct Below | * | | | Conveyor system incomplete. Not all components appear to have a valid listing label. Field evaluation by a NRTL may be required. |
2/1/2024 | Corrected | Correct Below | * | | | Baler and compactor installation incomplete. |