Click Here To View Another Inspection Inspection #: 791241 Inspection Type: Final Mechanical Inspector: Result: Comment: Previous final inspection on M22-1879 noted that Mechanical was completed with the exception of demolition, to be seen later. We were waiting for rooftop winter conditions to improve before demolishing the large AHU, and I failed to reschedule the final mechanical inspection after that work was completed. This inspection is to verify AHU demo so we can received final mechanical approval. Please give Shannon Massey (KLEBS) a call 30-45 mins prior to arrival. His cell phone number is 907-632-9046. Requested by: Michael Hunsicker 907-903-8636 mhunsicker@klebsheating.com Inspection Corrections DateStatusCodeDescriptionRefLocationComments