Inspection #: 791065
Inspection Type: Final Electrical
Inspector: O.Burbridge
Result: Approved
Comment: Phase 1 corrections completed. Remaining corrections transferred to Phase 2 permit. Electrical final approved.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
1/26/2024CorrectedCorrect Below*  Label service with available fault current and and date calculated.
1/25/2024CorrectedCorrect Below*  Platform required at rooftop condensing units so that centerline of disconnect handle is no greater than 6'7" from working platform.
1/25/2024CorrectedCorrect Below*  Main entry and receiving air doors incomplete.
1/25/2024CorrectedCorrect Below*  Compressor A and C require 200A max breakers.
1/25/2024CorrectedCorrect Below*  Shore power service and associated hook ups incomplete.
1/25/2024CorrectedCorrect Below*  Truck plugs at loading docks incomplete.
1/25/2024CorrectedCorrect Below*  Conveyor system not permitted to be fed with flexible cords. Flexible cords not permitted as substitute for fixed wiring methods.
1/25/2024CorrectedCorrect Below*  Bailer and compactor disconnects required bonding bushings.
1/25/2024CorrectedCorrect Below*  Bailer and compactor installation incomplete.
1/9/2024CorrectedCorrect Below*  Conveyor system incomplete.
1/9/2024CorrectedCorrect Below*  Heat trace incomplete.