1/25/2024 | Transfer | Correct Below | * | | | Platform required at rooftop condensing units so that centerline of disconnect handle is no greater than 6'7" from working platform. |
1/25/2024 | Transfer | Correct Below | * | | | No power at receiving mandoor exit light. |
1/25/2024 | Transfer | Correct Below | * | | | Main entry and receiving air doors incomplete. |
1/25/2024 | Transfer | Correct Below | * | | | Compressor A and C require 200A max breakers. |
1/25/2024 | Transfer | Correct Below | * | | | Shore power service and associated hook ups incomplete. |
1/25/2024 | Transfer | Correct Below | * | | | Truck plugs at loading docks incomplete. |
1/25/2024 | Transfer | Correct Below | * | | | Conveyor system not permitted to be fed with flexible cords. Flexible cords not permitted as substitute for fixed wiring methods. |
1/25/2024 | Transfer | Correct Below | * | | | Bailer and compactor disconnects required bonding bushings. |
1/25/2024 | Transfer | Correct Below | * | | | Bailer and compactor installation incomplete. |
1/9/2024 | Corrected | Correct Below | * | | | Ceiling fan incomplete. |
1/9/2024 | Corrected | Correct Below | * | | | Phase 2 incomplete. |
1/9/2024 | Corrected | Correct Below | * | | | Rooftop incomplete. |
1/9/2024 | Transfer | Correct Below | * | | | Conveyor system incomplete. |
1/9/2024 | Transfer | Correct Below | * | | | Heat trace incomplete. |
1/9/2024 | Corrected | Correct Below | * | | | 3 cage registers incomplete. |
1/9/2024 | Corrected | Correct Below | * | | | Freezer units at front entry to be relocated. |
1/9/2024 | Corrected | Correct Below | * | | | Entry heaters and exit signs incomplete. |