Click Here To View Another Inspection Inspection #: 784548 Inspection Type: Bond Beam Inspector: thomas.green Result: Approved Comment: Inspection for bond beam rebar in first lift above poured concrete wall at shipping loading dock on Grid Line 13.3. Special inspector report in attachments. Contractor to follow MOA Cold Weather Concrete and CMU Placement Policy and protect from freezing. Inspection Corrections DateStatusCodeDescriptionRefLocationComments