| Date | Status | Code | Description | Ref | Location | Comments |
| 5/21/2024 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Owner/builder to work with permitting to resolve open change orders and deferred submittals. |
| 5/21/2024 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Hood over cooking surface. | Install skirt from top of hood to ceiling tiles. |
| 5/21/2024 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Kitchen in ceiling. | Install missing tiles in ACT Grid ceiling. |
| 5/21/2024 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Women's restroom | Distance to center of toilet paper must be 7"-9" from front of toilet bowl. |
| 5/21/2024 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Both bathrooms | Reflective surface of mirror must be no more than 40" above floor. |