Click Here To View Another Inspection Inspection #: 779801 Inspection Type: Bond Beam Inspector: P.Calhoun Result: Approved Comment: CMU and rebar placement for 1st lift (TOF to 4') on walls at locations identified on SI report dated 10/4/2023. Maintain curing temperatures per MOA policy for cold weather concrete. Inspection Corrections DateStatusCodeDescriptionRefLocationComments