| Date | Status | Code | Description | Ref | Location | Comments |
| 8/9/2024 | | Notes | Fire Final Notes | Fire Final Notes: | | Vehicle protection for the tank at Gate N3 is being provided by concrete barriers. The scope of work for the ramps on a separate project will require removal of bollards. Vehicle protection will be installed at the time of the ramp renovation work. |
| 8/9/2024 | | Fire 1 | CO approval | Fire Final approved CO | | OK for CO |