Date | Status | Code | Description | Ref | Location | Comments |
7/28/2023 | | Notes | Fire Final Notes | Fire Final Notes: | | <div>The following items have been moved to Permit C22-2035 Inspection # 741203 for completion before lobby CCO occupancy. Anchorage Fire Department reserves the right to withdraw the CO of permit C19-2451 if the items are not completed under the work of permit C22-2035.</div><div><br></div><div>(1) Fire alarm changes in relation to addition of battery cabinets need to be completed in relation to change order X23-1440.</div><div><br></div><div>(2) Fire monitoring need to be operational.</div><div><br></div><div>(3) Emergency Stairway call boxes are not operational and must be completed and in compliance with 2012 IBC 403.5.3.1. It has not been identified where the constantly attended station will be located and dial out to 3rd party monitoring. Note: communication between the stairwell and fire command center is working. Outside monitoring and security desk shall to be setup and operation before fire final CCO. Adjust call sequencing to 5 rings before transfer. Post building address and instruction on call stair call boxes. Post instructions in fire command center.</div><div><br></div><div>(4) Provide all items required to be in the fire command center per 2012 IBC 403.4.6 and 911.1.5 items 1-18. 13 (13.1 and 13.2 will have to be addressed at TI buildouts), 13.3 one set of building plans as spaced get TI's completed, 17 Elevator recall switch in accordance with ASME A17.1 for existing 2 elevator in main lobby, 18 Elevator emergency or standby power selector switch(s).</div><div><br></div><div>(5)Need to verify that building keys are installed in Knox box and any access control cards for fire department access.</div><div><span style="white-space: normal;"><span style="white-space:pre"> </span> </span></div><div><br></div> |
7/28/2023 | | Fire 1 | CO approval | Fire Final approved CO | | Fire Final approved for CO for the core and shell substantial completion. |