| Date | Status | Code | Description | Ref | Location | Comments |
| 6/29/2023 | Transfer | Correct service item below | * | | Remote branch circuit panel. | Verify installation of ground rods. |
| 6/29/2023 | Transfer | Correct service item below | * | | Conduits from hazardous location lift station. | Verify proper bonding of all metal conduits to all enclosures for both intrinsically safe system and power wiring all the way back to the service per 504.60 and 501.30. |
| 6/29/2023 | Transfer | Correct service item below | * | | Intrinsically safe system conduits. | Verify labelling per 504.80. |
| 6/29/2023 | Transfer | Correct service item below | * | | Remote lift station control panel. | Verify separation of any intrinsically safe system conductors within the control panel from non-intrinsically safe conductors per 504.30(A)(2). |
| 6/29/2023 | Transfer | Correct service item below | * | | Remote lift station control panel. | Will need to verify proper pouring of sealing fittings. |
| 6/29/2023 | Transfer | Correct service item below | * | | Remote branch circuit panel. | Install panel schedule. |
| 6/29/2023 | Transfer | Correct service item below | * | | Remote branch circuit panel. | Requires breaker blank. |
| 6/29/2023 | Transfer | Correct service item below | * | | Service | Requires available fault current labelling with date calculated. |