Date | Status | Code | Description | Ref | Location | Comments |
9/25/2023 | Transfer | FireSprkHydro3 | Correction(s) #1 | <div>Correct the following item(s):</div><div><br></div> | | 1st floor dry system not holding pressure. |
9/25/2023 | Transfer | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | | 2nd & 3rd floor passed with 200 psi. all okay |