Date | Status | Code | Description | Ref | Location | Comments |
5/23/2023 | | Fire 21 | Correction(s) #8 | Please correct the following: | | Generator needs to have a F permit submitted for review with the fire department for compliance with NFPA 110 and load testing, now that it is being changed to an Emergency Generator under permit X23-1261. |
5/23/2023 | | Fire 20 | Correction(s) #7 | Please correct the following: | | Emergency Generator test on 5/19/2023 was not able to be completed do to breaker installed is too small to accommodate 100% load bank test per NFPA 110. Generator test did pass building load test. |
5/23/2023 | | Fire 19 | Correction(s) #6 | Please correct the following: | | Fire Smoke Dampers for Fire Department Command Center per 2012 IBC 911.1.2 must be connected to fire alarm system per 2012 IBC 717.3.3.2 #1. Fire penetrations to comply with 707.7,714 and 717. Per Sam Adams the duct will have smoke dampers installed, may not happen until the TI on the lobby is complete. Smoke damper will be intertied to close on any smoke detector on the 1st floor. |
5/23/2023 | | Fire 9 | Knox key | Fire Dept approved Knox Box required at Front Main Entry with keys to building for emergency responders.
| | Need to verify that building keys are installed in knox box and any access control cards for fire department access. |
5/23/2023 | | Fire 17 | Correction(s) #4 | Please correct the following: | | Emergency Stairway call boxes are not operational and must be completed and in compliance with 2012 IBC 403.5.3.1. It has not be identified where the constantly attended station will be located and dial out to 3rd party monitoring. Note: communication between the stairwell and fire command center is working. |
5/23/2023 | | Fire 18 | Correction(s) #5 | Please correct the following: | | Provide Installers certificates of completion for all systems: Fire Pump, Emergency Generator and Smoke Control |
5/23/2023 | | Fire 2 | CCO approval | Fire Final approved for CCO | | Okay for C.C.O. for Core & Shell only till August 1, 2023. Building is ready for TI Building Out |
5/22/2023 | | Fire 15 | Correction(s) #2 | Please correct the following: | | Emergency Exit Stairwells are over pressurized for compliance with 2012 IBC 1008.1.3 with a maximum opening force of greater than 30 pounds on North stair floors 9 & 3 and South stair floors 5,3 & 2. Special Inspectors report from Support Services of Alaska is invalid from May 16, 2023 by JaDee Moncur. Retest will need to be witness by Anchorage Fire Department. |
5/22/2023 | | Fire 16 | Correction(s) #3 | Please correct the following: | | Provide all items required to be in the fire command center per 2012 IBC 403.4.6 and 911.1.5 items 1-18. Missing items 10 (Telephone on POTS Line), 13 (13.1 and 13.2 will have to be addressed at TI buildouts), 13.3 one set of building plans, 17 Elevator recall switch in accordance with ASME A17.1 for existing 2 elevator in main lobby, 18 Elevator emergency or standby power selector switch(es). |
5/22/2023 | | Fire 13 | Correction(s) #1 | Please correct the following: | | High-rise building requires an Emergency Power System per 2012 IBC 403.4.9 with the required emergency loads as required by 403.4.9.1 for the elevator car lighting, fire alarm system and fire pump. Generator load testing is required to be witness by Anchorage Fire Department. Change order x23-1261 is in review. |
5/22/2023 | | Fire 8 | Bollards | Bollard protection required to protect gas meter. | | Verify or provide protection of the gas meter and generator from vehicle impact with bollards. 2012 IFC 5704.2.9.7.5 and 312. Possibly temporary solution is to put Jersey barriers. |