| Date | Status | Code | Description | Ref | Location | Comments |
| 3/7/2024 | Transfer | Correct Below | * | | | Exterior lighting incomplete. |
| 3/7/2024 | Transfer | Correct Below | * | | | Receptacles along back wall at reception are loose (box pulls out of wall) and must be flush against wall. |
| 3/7/2024 | Transfer | Correct Below | * | | | 2 exit signs between lobby and hallway incomplete. |
| 3/7/2024 | Transfer | Correct Below | * | | | Special receptacle at nook area incomplete. |
| 3/7/2024 | Transfer | Correct Below | * | | | Peninsula at retail area incomplete. |
| 3/7/2024 | Transfer | Correct Below | * | | | Bathroom receptacles incomplete. |
| 3/7/2024 | Transfer | Correct Below | * | | | Panels must be labeled with source. |
| 3/7/2024 | Transfer | Correct Below | * | | | If building is intended to be partially occupied before project is completed a deferred submittal must be provided which details the phase plan. The phase plan must specifically identify which portions of the building are intended to be occupied, any life safety systems, egress paths, and construction area separation methodology.
|