Click Here To View Another Inspection Inspection #: 755548 Inspection Type: Underground Plumbing Inspector: Y.Dovba Result: Partial Comment: Partial underground dwv rough-in and test Approved. Per approved plans, (B3M20).Grid line 1-through 2.9, section B-through B.6. 4'' vertical riser, 3'' vertical riser, floor clean-out, floor drains, and 2'' wastes serving sinks. NOTE: Per 2018 UPC section 314.4 use clean fill and protect piping through slab. NOTE: Per 2018 UPC 707.4 clean outs required above slab. NOTE: Toilet carriers will be install, piped and inspected at a later date. Inspection Corrections DateStatusCodeDescriptionRefLocationComments