Date | Status | Code | Description | Ref | Location | Comments |
3/24/2023 | Corrected | Correct Below | * | | Above sales counter. | Circuit 28, panel THHD. GFCI protection is required to be readily accessible. |
3/24/2023 | Corrected | Correct Below | * | | Ceiling. | Seismic support required for lighting. Wiring required to run vertically and attach to lights. Fasten lights to grid. |