| Date | Status | Code | Description | Ref | Location | Comments |
| 4/5/2023 | Transfer | Correct rough-in item below | * | | | Corridors where ceiling grid has been removed must have electrical work corrected to meet current NEC requirements. |
| 3/20/2023 | Transfer | Correct rough-in item below | * | | | Verify fire separation method for junction boxes between rooms |
| 3/20/2023 | Transfer | Correct rough-in item below | * | | PTAC units | White wire not permitted to be rephrased as green. Disconnect from grounds and safe off. |
| 3/20/2023 | Transfer | Correct rough-in item below | * | | bathrooms | Bathroom backlit mirror whips incomplete. |