Date | Status | Code | Description | Ref | Location | Comments |
3/17/2023 | | Fire 5 | FDC sign | Provide FDC sign at location visible from the street building is addressed on. Letters msut be a minimum of 6" high. | | Provide FDC signs for standpipe and fire sprinkler per approved fire sprinkler plans |
3/17/2023 | | Notes | Fire Final Notes | Fire Final Notes: | | There may be other items not noted. |
3/17/2023 | | Fire 8 | Bollards | Bollard protection required to protect gas meter. | | Verify or provide protection of the generator from vehicle impact with bollards. 2012 IFC 5704.2.9.7.5 and 312 |
3/17/2023 | | Fire 21 | Correction(s) #8 | Please correct the following: | | <div>Need to verify compliance 2010 NFPA 20 Section 4.12.2.1.1 Fire pump rooms not directly accessible from the outside shall be accessible through an enclosed passageway from an enclosed stairway or exterior exit. The enclosed passageway</div><div>shall have a minimum 2-hour fire-resistance rating. The will include the 1st floor North hallway to the stairway, North stairway, basement hall to the fire pump room.</div> |
3/17/2023 | | Fire 20 | Correction(s) #7 | Please correct the following: | | Provide all items required to be in the fire command center per 2012 IBC 403.4.6 and 911.1.5 items 1-18. Missing items 2, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 17, 18 |
3/17/2023 | | Fire 19 | Correction(s) #6 | Please correct the following: | | <span>Provide Installers certificates of completion for all systems: Fire Sprinklers, Fire Alarm, Fire Pump, Fire Standpipe, Emergency Generator and Smoke Control</span> |
3/17/2023 | | Fire 18 | Correction(s) #5 | Please correct the following: | | <span>Fire Smoke Dampers for Fire Department Command Center per 2012 IBC 911.1.2 must be connected to fire alarm system per 2012 IBC 717.3.3.2 #1. </span><div><span>Fire penetrations to comply with 707.7,714 and 717</span></div> |
3/17/2023 | | Fire 17 | Correction(s) #4 | Please correct the following: | | <span>Emergency Stairway call boxes are not operational and must be completed and in compliance with 2012 IBC 403.5.3.1. It has not be identified where the constantly attended station will be located. </span> |
3/17/2023 | | Fire 16 | Correction(s) #3 | Please correct the following: | | <span>High-rise building requires an Emergency Power System per 2012 IBC 403.4.9 with the required emergency loads as required by 403.4.9.1 for the elevator car lighting, fire alarm system and fire pump. Generator load testing is required to be witness by Anchorage Fire Department. </span> |
3/17/2023 | | Fire 15 | Correction(s) #2 | Please correct the following: | | <span>Complete fire signage interior and exterior of building to include stairway signs identifying each floor with or without roof access. </span> |
3/17/2023 | | Fire 13 | Correction(s) #1 | Please correct the following: | | <span>Emergency Exit stairs are over pressurized for compliance with 2012 IBC 1010.1.3. Smoke control system requires a Special Inspector per 2012 IBC 1705.3 Table 1705.3 #4</span> |
3/17/2023 | | Fire 2 | CCO approval | Fire Final approved for CCO | Core and Shell | Okay for C.C.O. for Core & Shell only till June 1, 2023. Building is ready for TI Building Out |