Date | Status | Code | Description | Ref | Location | Comments |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | 2nd floor Shaft Rm | Gasket rated shaft wall door. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Level 2 Mech. Shaft. | Repair damage and removed GWB at existing rated walls. Note** Temp guardrails in place until perm. guardrails installed. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Level 5 Electrical Rm | Complete fire stopping around rated hard lid and penetrations. And complete fire rated signage. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Electrical Room | Complete fire stopping around mech. shaft at head of wall. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Fire rated doors. | Thresholds at rated doors shall not exceed 3/4 inch in height above finish floor. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Mech. Shaft in Electrical Rm. | Complete metal angle around fire damper. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Electrical Room | Complete rated wall signage. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Complete floor signage in stairwell for each level. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Complete bathroom and stairwell signage. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Make adjustments to all required fire doors to close and latch. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Electrical Room | Provide engineers judgment and special inspection report for electrical equipment floor penetrations. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Janitors closet | Fire stop floor sink drains with approved UL listed assembly. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Install Permanent address #'s. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | | Complete installation of exterior glazing. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Bathrooms | Complete install of trash receptacles and mirrors. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Electrical Room | Fire stop open floor pipes that communicate with floors above and below. |
3/1/2023 | Transfer | FNLSG | Final Structural Other | Please correct the following: | Penthouse | Fire stop missed penetrations and metal angle around fire dampers. |