Inspection #: 748320
Inspection Type: Final Electrical
Inspector: O.Burbridge
Result: Correction
Comment: progress final- corrections and rooftop, lighting and exterior remain

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
2/15/2023TransferCorrect Below*  basement connections for rooftop lighting incomplete
2/15/2023TransferCorrect Below*  basement sump pump incomplete
2/15/2023TransferCorrect Below*  breaker lock required for heat trace in south stairwell
2/2/2023TransferCorrect Below*  label service with available fault current and date calculated
2/2/2023TransferCorrect Below*  shunt trip switch for generator requires labels
2/2/2023TransferCorrect Below*  bathroom on mezzanine incomplete
2/2/2023TransferCorrect Below*  Conduits on rooftop must be GRC or IMC per local amendment 300.4I.
2/2/2023TransferCorrect Below*  Generator and chillers on rooftop require disconnects to be no higher than 6'7" above work surface to centerline of handle in highest position. (404.8A)