| Date | Status | Code | Description | Ref | Location | Comments |
| 1/17/2023 | Corrected | ACTC | See Inspector comments | Inspector comments | | Install lights and diffusers to verify hanger wires and attachments complete. |
| 1/17/2023 | Corrected | ACTC | See Inspector comments | Inspector comments | | Install perimeter hanger wires within 8" of wall. |
| 1/17/2023 | Corrected | ACTC | See Inspector comments | Inspector comments | | Install berc clips on (2) sides. |