| Date | Status | Code | Description | Ref | Location | Comments |
| 4/28/2023 | | Fire 13 | Correction(s) #1 | Please correct the following: | | Fire sprinkler coverage is over spaced in the following areas: <div>Hall by Coffee room (132). </div><div>Hall (106) by reception desk leading to main lobby. </div><div>Main lobby (100) by glass wall separating conference 101 and lobby 100. </div><div><br></div><div>Entire remodel space need to be evaluated by a fire sprinkler company for code compliant coverage and provide installer certification. </div> |
| 4/27/2023 | Transfer | Fire 15 | Correction(s) #2 | Please correct the following: | | 1) need to have Fire extinguishers replaced or recertified with correct tag. |