| Date | Status | Code | Description | Ref | Location | Comments |
| 11/16/2022 | Corrected | Correct Below | * | | 1st floor ceiling in front of Pharmacy counters. | Was not rough inspected. |
| 11/16/2022 | Transfer | Correct Below | * | | 3rd floor offices. | Electric raising and lowering tables not listed. UPDATE TO THIS CORRECTION: BOTH CONTRACTOR AND INSPECTOR COULD NOT FIND LISTING LABELS ON DESKS AT THIS INSPECTION. |
| 11/16/2022 | Transfer | Correct Below | * | | 3rd floor office area remodel. | Drawings need the following changes: 1. Room numbers need to be changed to reflect actual configuration. 2. Show actual work done. Work not being done needs to be removed from plans. UPDATE TO THIS CORRECTION: ENGINEER NEEDS TO SEND FILLED-OUT FIELD CHANGE ORDER FORM TO INSPECTOR ALONG WITH ANY REVISED DRAWINGS. MAKE SURE THAT ROOM NUMBERS ARE CHANGED. |
| 11/16/2022 | Corrected | Correct Below | * | | 2nd floor Dental Reception area. | Work consists of new Reception soffit with recessed lights, new reception desk pony wall receptacles, LED retrofit kits in 2 x 2 troffers. Please provide electrical rough inspections. |
| 11/16/2022 | Corrected | Correct Below | * | | 1st floor Pharmacy soffits by motorized shutters at counters. | Drivers at canless recessed lights need to be secured to structure. |