Date | Status | Code | Description | Ref | Location | Comments |
10/12/2022 | Transfer | Correct Below | * | | Panel | Update panel schedule |
10/12/2022 | Corrected | Correct Below | * | | Front counter | Is not a listed assembly to be plugged into the wall. Front counter will need to be wired to chapter 3 wiring methods. |
10/12/2022 | Transfer | Correct Below | * | | Throughout | MC cable needs to be supported so it is not lying on suspended ceiling. |
10/12/2022 | Transfer | Correct Below | * | | Patient care areas | All branch circuits serving these spaces shall be provided with an effective ground fault current path. 2017 NEC 517.13 A
This includes circuits that go to light switches as well as receptacles. |