| Date | Status | Code | Description | Ref | Location | Comments |
| 9/9/2022 | Transfer | Correct Below | * | | Lift Station | 1. Engineer needs to specify that this is a grey water lift station if not to be regarded as hazardous location. 2. Receptacle under lid required to be GFCI protected. GFCI device to be readily accessible. |
| 9/9/2022 | Transfer | Correct Below | * | | EBCO dough divider. | May require attachment plug for cord connection. |
| 9/9/2022 | Transfer | Correct Below | * | | Stephan Hameln dough mixer. | Installation requires 35A slow-blow fuses. May require attachment plug for cord connection. |
| 9/9/2022 | Transfer | Correct Below | * | | MAU | Needs disconnect. |
| 9/9/2022 | Transfer | Correct Below | * | | Kitchen RTU. | 1. Gas piping violates 110.26 working clearances. 2. Label unit to match breaker designation. 3. Service receptacle not type WR. |
| 9/9/2022 | Transfer | Correct Below | * | | Corporate office RTU. | 1. Requires disconnect. 2. Label to correspond with breaker designation. |
| 8/29/2022 | Transfer | Correct Below | * | | | additional items may be present- panel schedules not provided and not all receiving devices/wiring/panel makeup has been completed |
| 8/29/2022 | Corrected | Correct Below | * | | | disconnects required for hardwired appliances |
| 8/29/2022 | Transfer | Correct Below | * | | | need access to rooftop |
| 8/29/2022 | Corrected | Correct Below | * | | | hood controller incomplete |
| 8/29/2022 | Corrected | Correct Below | * | | | panel schedules and bundling required at panels |
| 8/29/2022 | Corrected | Correct Below | * | | | ground fault protection, breakers locks and warning labels required for heat trace circuits |
| 8/29/2022 | Corrected | Correct Below | * | | | receiving area not complete- |
| 8/29/2022 | Corrected | Correct Below | * | | | receptacles miswired at POS and office |
| 8/29/2022 | Corrected | Correct Below | * | | | some emergency lighting units and remote heads are not functioning properly |
| 8/29/2022 | Corrected | Correct Below | * | | | gfci protection required for all kitchen receptacles per NEC 210.8B |
| 8/29/2022 | Corrected | Correct Below | * | | | sign permit required for new Little Caesar's sign |
| 8/29/2022 | Transfer | Correct Below | * | | | Special permission terms for new service are required to be met- shunt trips at each service location, placarding of other service location, additional disconnect at south service, soffit lighting on Little Caesars service etc. UPDATE TO THIS INSPECTION COMMENT: 1. PLACARDING DENOTING (2) SERVICES IS REQUIRED TO CONFORM TO 230.2(E). 2. MALL WIRING IN LITTLE CAESAR'S SOFFIT NEEDS TO BE REMOVED. 3. SHUNT TRIPS AT BOTH SERVICES AND NEW SOUTH SERVICE MAIN DISCONNECT DATE FOR COMPLETION TO BE SET AT REINSPECTION ON OR BEFORE 9/23/2022. |