Click Here To View Another Inspection Inspection #: 728295 Inspection Type: Mechanical Rough Inspector: K.Hanson Result: Partial Comment: Partial Mechanical Rough - Approved To include the install of FSDs & access door related to 9th fl. S, R & E/A ducting, serving existing & Z-line (East) shafts, E/A branch & main ducting serving bsmt-6th fls & seismic bracing all fls. related to Z-line (East ) shaft S/A ducting, OK to cover all. NOTE: Framing clearance inspection required at each fl. related to North stairwell T/A FD. Inspection Corrections DateStatusCodeDescriptionRefLocationComments