| Date | Status | Code | Description | Ref | Location | Comments |
| 8/11/2022 | Transfer | Correct service item below | * | | provide timetable for shunt trip and installation on new disconnect on south service. so conditional service approval can be granted, | |
| 8/11/2022 | Transfer | Correct service item below | * | | verify and accessible wiring from other tenant spaces or common systems and place to remove other accessible wiring from space. | |
| 8/11/2022 | Transfer | Correct service item below | * | | provide on approved paperwork on special permission/alternate means. | |
| 8/8/2022 | Transfer | Correct service item below | * | | Grounding electrode conductor connection to water line. | Bond around water meter with 3/0 AWG copper conductor. |
| 8/8/2022 | Transfer | Correct service item below | * | | Change Order to engineered drawings. | Engineered drawings required to show the means / configuration of shunt trip arrangement for the (2) services on one building as required by the Alternate Means and Methods. Changed drawings will need to be stamped approved by MOA Plan Review. |
| 7/18/2022 | Transfer | Correct service item below | * | | provide documentation "change order or alternate means" allowing for 2nd service to building and provide CEA approval for 2nd service per 302.4 of CEAs Electrical Service Requirements. | |