| Date | Status | Code | Description | Ref | Location | Comments |
| 8/8/2022 | Transfer | Correct service item below | * | | Grounding electrode conductor connection to water line. | Bond around water meter with 3/0 AWG copper conductor. |
| 8/8/2022 | Transfer | Correct service item below | * | | Change Order to engineered drawings. | Engineered drawings required to show the means / configuration of shunt trip arrangement for the (2) services on one building as required by the Alternate Means and Methods. Changed drawings will need to be stamped approved by MOA Plan Review. |
| 7/29/2022 | Corrected | Correct service item below | * | | (3) of (3) written, special permissions for non-standard service configuration. | 3. CEA WAIVER TO PERMIT ERICCSON 400A, 3-PHASE COMBO CT / SERVICE DISCONNECT. Currently known CEA identified deficiencies: 1. Equipment will not physically accept (2) 4in service lateral conduits. 2. Utility compartment / chase not permitted to be behind another cover. 3. CT compartment does not meet CEA size requirements. 4. CEA believes that line crew will have to remove service OCPD to pull in service lateral. |
| 7/29/2022 | Corrected | Correct service item below | * | | (2) of (3) written, special permissions for non-standard service configuration. | 2. CEA WAIVER PERMITTING 2ND SERVICE TO A SINGLE BUILDING THAT DOES NOT MEET CEA REQUIREMENTS FOR A 2ND SERVICE. |
| 7/29/2022 | Transfer | Correct service item below | * | | Written, special permissions for (2) services to (1) building. | Alternate Means and Methods, signed by the Building Official will serve as the "special permission." Alternate Means will require shunt trip at each service location so that emergency responders can shut off all power to both services from either service location. |
| 7/29/2022 | Corrected | Correct service item below | * | | Grounding electrode conductor to water line. | GEC connection is currently made above a T-bar grid ceiling in a neighboring TI space. GEC connections to water line electrodes are required to be made within 5ft of water pipe entrance into the building. |
| 7/29/2022 | Corrected | Correct service item below | * | | Service raceway. | NEC requires a minimum 1/0 CU bonding jumper from service raceway to service enclosure. |
| 7/29/2022 | Corrected | Correct service item below | * | | Service. | Main grounding electrode conductor to water line needs to terminate directly on the neutral bus. |
| 7/18/2022 | Transfer | Correct service item below | * | | provide documentation "change order or alternate means" allowing for 2nd service to building and provide CEA approval for 2nd service per 302.4 of CEAs Electrical Service Requirements. | |