| Date | Status | Code | Description | Ref | Location | Comments |
| 7/21/2022 | Transfer | PlumbRgh14 | Comments | See Inspectors Comments | Underfloor Acid waste kitchen piping. | Per 2018 UPC section 707.4 install clean-outs at upper terminals above the floor at kitchen equipment wall. NOTE: this correction can be inspected at final. |