Inspection #: 714128
Inspection Type: Final Electrical
Inspector: M.Green
Result: Partial
Comment: Requested by: Tim Gorham 3506496 tgorham@alcanelectric.com | | Partial electrical final. Some items corrected; others outstanding. Items dated 6/3/2022 were re-entered as they did not carry forward to this report.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
6/3/2022TransferCorrect Below* KitchenWill need to check appliances for listings, etc.
6/3/2022TransferCorrect Below* Back of house Pantry 157.Walk-in cooler not installed.
6/3/2022TransferCorrect Below* Various - motorized shades.120V motorized shades do not have a listing mark. The UR mark is not the equivalent of a listing.
6/3/2022TransferCorrect Below* Microturbine.CEA written acceptance required.
5/16/2022CorrectedCorrect Below* Lobby by restrooms.Wall lighting panels not installed.
5/16/2022TransferCorrect Below* Manual transfer switch.If neutral is NOT switched, label service per 702.7(B). Label service per 702.7(A) to indicate portable generator connection point. Label per 702.7(C) to indicate type of generator that may be connected. Neutral not switched: "WARNING: FOR CONNECTION OF A NONSEPARATELY DERIVED (FLOATING NEUTRAL) SYSTEM ONLY."
5/16/2022TransferCorrect Below* Service 705.10 requires a directory denoting all alternate power source disconnecting means on premises. The directory needs to include both portable generator and microturbine disconnect locations.
5/16/2022TransferCorrect Below* Microturbine. UPDATE ON GROUNDING COMMENTS.480V supply from microturbine to stepdown transformer - is this a separately derived system? Does it require a grounding electrode conductor connection? If no system grounding, engineer needs to explain. PER CAPSTONE VENDER: THE CAPSTONE IS A SEPARATELY DERIVED SYSTEM AND REQUIRES A GEC TO NEUTRAL BOND. THE "Y" CONNECTED TRANSFORMER SECONDARY CENTERPOINT IS NOT TO BE GROUNDED; IT DERIVES IT'S GROUND REFERENCE FROM THE SERVICE.
5/16/2022CorrectedCorrect Below* Microturbine and 277/480V to 120/208V stepdown transformer.Transformer as installed is Y - Y configuration. Transformer is different from the approved drawings. Engineer needs to approve the change.
5/16/2022CorrectedCorrect Below* Microturbine.Remove gas lines, any other obstructions from 110.26 working clearance area in front of electrical compartment. Existing curb is approx. 12in high and extends approx. 12in horizontally beyond the face of the electrical compartment. Working platform required to be extended to provide 3ft level space beyond the face of the electrical compartment.