DateStatusCodeDescriptionRefLocationComments
5/16/2022TransferCorrect Below* Lobby by restrooms.Wall lighting panels not installed.
5/16/2022TransferCorrect Below* Manual transfer switch.If neutral is NOT switched, label service per 702.7(B). Label service per 702.7(A) to indicate portable generator connection point. Label per 702.7(C) to indicate type of generator that may be connected.
5/16/2022TransferCorrect Below* Service 705.10 requires a directory denoting all alternate power source disconnecting means on premises.
5/16/2022TransferCorrect Below* Microturbine.480V supply from microturbine to stepdown transformer - is this a separately derived system? Does it require a grounding electrode conductor connection? If no system grounding, engineer needs to explain.
5/16/2022TransferCorrect Below* Microturbine and 277/480V to 120/208V stepdown transformer.Transformer as installed is Y - Y configuration. Transformer is different from the approved drawings. Engineer needs to approve the change.
5/16/2022TransferCorrect Below* Microturbine.Remove gas lines, any other obstructions from 110.26 working clearance area in front of electrical compartment. Existing curb is approx. 12in high and extends approx. 12in horizontally beyond the face of the electrical compartment. Working platform required to be extended to provide 3ft level space beyond the face of the electrical compartment.
5/11/2022TransferCorrect Below* Microturbine. Will need to see CEA written acceptance of alternate power source.
5/11/2022TransferCorrect Below* Rooftop above pool. MAU labelled to require 15A OCPD. RTUs labelled to require 40A OCPD max.
5/11/2022TransferCorrect Below* Site lighting.Pole lights require a ground wire connection at the hand hole.
5/11/2022TransferCorrect Below* KitchenWill need to see appliances to check for listings, etc.
5/11/2022CorrectedCorrect Below* Back of house mech room.(2) circ pump disconnects have Class 2 wiring inside.
5/11/2022TransferCorrect Below* Back of house Pantry 157.Walk-in cooler not installed.
5/11/2022TransferCorrect Below* Motorized shades.No apparent listing label. Do not use until listing verified.
5/11/2022CorrectedCorrect Below* Guest room AC units.Need 15A breakers
5/11/2022TransferCorrect Below* Various guest rooms and conference rooms.120V motorized window shades do not appear to be listed. Do not use until listing can be verified or until listed units can be installed.
5/11/2022CorrectedCorrect Below* Guest room AC units floors 1 through 3.Labelled to require 15A OCPD.