Click Here To View Another Inspection Inspection #: 709580 Inspection Type: Mechanical Rough Inspector: Y.Dovba Result: Approved Comment: Mechanical rough Approved. Grease weld ducting: 2-connecting 90s, 1-horizontal section with cleanout, 1-vertical connecting section to the hood with a cleanout ok for 1st layer of fire wrap. Existing RTU S/A & R/A was reconfigured to accommodate new ceiling grid layout. New RTU #1 S/A & R/A hard ducting complete. NOTE: Final fire wrap, cleanout covers, RTU and exhaust curb along with flex ducting connection ceiling diffusers will be completed and inspected at final. Inspection Corrections DateStatusCodeDescriptionRefLocationComments