Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 708511
Inspection Type: Final Fire Inspection
Inspector: M.Warren
Result: CondAppr
Comment: We have 80% of the glass installed and visquene over the remaining openings. The lady shipment of glass should be arriving the first week of May. Requested by: Grady Putman 907-227-6445 Gputman@rhcak.com

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
4/18/2022 Fire 13Correction(s) #1Please correct the following: In order for no fire watch and occupancy allowed install plywood or similar material at top row of window openings in order to form a draft stop as heat collection for the sprinkler system to activate in case of fire. It is anticipated that the balance of the glass will be installed by the second week of May.
4/7/2022 Fire 13Correction(s) #1Please correct the following: The following Items need correction: 1) glass wall on west side of area needs to be installed.