Click Here To View Another Inspection Inspection #: 707563 Inspection Type: Framing / Int. Inspector: H.Kahlstrom Result: Approved Comment: Framing at exterior of bathrooms walls at floors 2,3,4,5 have been completed. Framing of bathroom steel stud framed lids at floors 5 & 6 have been completed. Inspection Corrections DateStatusCodeDescriptionRefLocationComments