| Date | Status | Code | Description | Ref | Location | Comments |
| 9/7/2022 | Transfer | Correct Below | * | | Fleet and Ground Ops. | Low voltage cable from dimmer switch cannot intermix with other Class 2 wiring if low voltage power supply wiring is open free air. |
| 9/7/2022 | Transfer | Correct Below | * | | Fleet and Ground Ops. (Septic lift hazardous location) | Cord ends require sealing at point where cords splice to normal building wiring. |
| 9/7/2022 | Transfer | Correct Below | * | | Fleet and Ground Ops. (Septic lift hazardous location) | Cords leaving septic well need to be in a conduit to the point where cords transition to the permanent wiring method. Any conduits leaving the C1 D1 area are required to have a boundary seal. |
| 9/7/2022 | Transfer | Correct Below | * | | Fleet and Ground Ops. (Septic lift hazardous location) | 501.30 and 501.30(A) requires all metal conduits to be bonded to all metal enclosures from the hazardous location, all the way back to the service or separately derived system (transformer secondary). |
| 9/7/2022 | Transfer | Correct Below | * | | Fleet and Ground Ops. | Lift station pumps - does the float system and sequence of operations keep the pumps submerged? |
| 9/7/2022 | Transfer | Correct Below | * | | Fleet and Ground Ops. | Sewage lift station pumps etc. do not appear to have listings. |
| 9/7/2022 | Transfer | Correct Below | * | | Inflight area. | Crew Ready bar power not complete. |
| 9/7/2022 | Transfer | Correct Below | * | | ATO / BCO | Permanent label required at distribution panel for ATO / BCO feeder breaker. |
| 9/7/2022 | Transfer | Correct Below | * | | ATO / BCO | Office furniture not installed at this time. |
| 9/7/2022 | Transfer | Correct Below | * | | ATO / BCO | (1) smart switch on order. |
| 9/7/2022 | Transfer | Correct Below | * | | ATO / BCO break area. | Counter receptacles not installed - backsplash not installed. |