Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 703751
Inspection Type: Electrical Rough
Inspector: M.Green
Result: Partial
Comment: Would like schedule inspection at 1 PM Requested by: Tim Gorham 3506496 tgorham@alcanelectric.com | | 1st floor T-bar grid ceilings, electrical rough approved in the following: *Conference Rooms (except projector outlets). *Corridor 134. *Back of House, corridors and rooms (except for several exhaust fans).

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
1/26/2022Transfer01See inspection comments Conference room bathroom-southVerify access is provided for fan control/louver at ceiling location. Ceiling access planned.
10/25/2021Transfer01See inspection comments Microturbine-one line diagram, separately derived system. Grounding electrode conductor required.
10/25/2021Transfer01See inspection comments Service, microturbineVerify microturbine configuration with utility. Verify disconnecting means and requirement for having lockable disconnect. Labeling required for alternate source per 702.
10/25/2021Transfer01See inspection comments Service.Label AFC and date calculated.
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS