Muni.org > Departments > Development Services> Permit Information & Inspection Request
Click Here To View Another Inspection


Inspection #: 700050
Inspection Type: Electrical Rough
Inspector: M.Green
Result: Partial
Comment: Requested by: Tim Gorham 907-350-6496 Tgorham@alcanelectric.com | | Sheetrock ceilings and soffits electrical rough approved in the area around the main lobby: *"Tactic", *"Listening", Closet outside of "Tactic", 3 alcoves on the west side of the lobby, "Refuel", all soffits and beam wraps in the main lobby ceiling.

Inspection Corrections
DateStatusCodeDescriptionRefLocationComments
1/26/2022Transfer01See inspection comments Conference room bathroom-southVerify access is provided for fan control/louver at ceiling location. Ceiling access planned.
10/25/2021Transfer01See inspection comments Microturbine-one line diagram, separately derived system. Grounding electrode conductor required.
10/25/2021Transfer01See inspection comments Service, microturbineVerify microturbine configuration with utility. Verify disconnecting means and requirement for having lockable disconnect. Labeling required for alternate source per 702.
10/25/2021Transfer01See inspection comments Service.Label AFC and date calculated.
ADA Compliance      Privacy Statement & Disclaimer      Employee Search      eNewsletter      RSS