Date | Status | Code | Description | Ref | Location | Comments |
2/4/2022 | Transfer | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | Main Lobby | Okay for main lobby. |
1/24/2022 | Transfer | FireSprkHydro1 | Approved Hydrostatic Test | Approved fire sprinkler system hydrostatic test | 1st floor, east corner | Tested to 200 psi, all okay to proceed |
12/28/2021 | Transfer | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | Pool Area | Both main lines and all branch lines test to 200 PSI, No leaks visible at the time of this inspection |
12/14/2021 | Transfer | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | 2nd Floor East half. | Hydro test to 200 PSI. I could see no issues at the time of this inspection |
12/10/2021 | Transfer | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | | Hydro for Conference room only. 200 PSI on line and no leaks observed. |
12/8/2021 | Transfer | FireSprkHydro2 | Partial Hydrostatic Test | Partial approval for fire sprinkler system hydrostatic test for the following area(s): | | Hydro for west First floor only was 200 psi. I could see no issues at the time of this inspection. |
12/2/2021 | Transfer | FireSprkHydro1 | Approved Hydrostatic Test | Approved fire sprinkler system hydrostatic test | | 3rd Floor only hydro test. 200+ psi. I could see no leaks at the time of this this inspection. |