Click Here To View Another Inspection Inspection #: 698266 Inspection Type: Shaftwall Inspector: H.Kahlstrom Result: Approved Comment: Core board shaft liner assembly at mezzanine level is in place at MPE (existing shaft). Level 9 stairwell at North side and returns of shaft liner at columns with spray applied fire proofing. Inspection Corrections DateStatusCodeDescriptionRefLocationComments