Date | Status | Code | Description | Ref | Location | Comments |
10/25/2021 | Transfer | 01 | See inspection comments | | Microturbine-one line diagram, separately derived system. | Grounding electrode conductor required. |
10/25/2021 | Transfer | 01 | See inspection comments | | Service, microturbine | Verify microturbine configuration with utility. Verify disconnecting means and requirement for having lockable disconnect. Labeling required for alternate source per 702. |
10/25/2021 | Transfer | 01 | See inspection comments | | Service. | Label AFC and date calculated. |