Click Here To View Another Inspection Inspection #: 695678 Inspection Type: Other Structural Inspector: H.Kahlstrom Result: Approved Comment: Rebar placement SOMD pour back areas at floor 2 and 3 at grids A/1-3, 6/E-G, G/5-6. Halfen channel anchor welds are in place. Mullion supports (vertical rebar stubs) are in place. Inspection Corrections DateStatusCodeDescriptionRefLocationComments