Click Here To View Another Inspection Inspection #: 695175 Inspection Type: Framing Inspector: H.Kahlstrom Result: Approved Comment: Drywall inspection at 4th floor 9-16 (RC channel is in place.) 3rd floor 9-16 (RC channel is in place) drywall screw pattern is approved. 1st floor GWB and RC where installed is approved. 2nd floor F line (NE corner of bldg.) mechanical shafts are complete with C-H studs and shaftliner. Inspection Corrections DateStatusCodeDescriptionRefLocationComments