Click Here To View Another Inspection Inspection #: 682966 Inspection Type: Framing / Ext. Inspector: H.Kahlstrom Result: Approved Comment: Exterior framing of penthouse roof top area and architectural screen area is complete per plan. Prefabricated steel stairs are in place welded and bolted, with welds having been inspected but not post-installed anchors. 9th floor screen wall supports have been inspected bolts/welds are complete. Inspection Corrections DateStatusCodeDescriptionRefLocationComments